Q1. A) using the figure above calculate the distance from t

Q1. A) using the figure above calculate the distance from the focus… Image transcription textQ 18 Reading a seismogram S wave maximum amplitude N (2.7 mm/s) 1 0 Wave amplitude (mm/s) – 1 P wavearrival S wave arrival -2 (0:7 s) (8.7 s) S wave minimum amplitude (-2.8 mm/s) -3 12 5 0 2 4 6 8 10 Figure 5Seismograph from a small (M4) earthquake that took place in Canada in 1997…. Show more Q1. A) using the figure above calculate the distance from the focus of the earthquake to the location of the seismometer that produced the above trace show all working Q2. Water is a limited natural resource, especially in Australia. Part of the solution is to conserve water by recycling it. The Bondi stormwater scheme was designed to harvest and re-use stormwater previously discharged into the ocean.   More information on this is found at:   http://www.waverley.nsw.gov.au/environment/water and coast/our projects/bond  Stormwater project  A) Outline by a flow chart the main stages involved in this. Provide a brief explanation for the main steps.Science Environmental Science